Mohawk Avery Grove Flooring in Charleston

Prepare for Flooring Installation

Posted by:

|

On:

|

A smooth flooring installation in Charleston comes down to more than just picking the right material. It depends on how well the home is prepared before the crew ever arrives. Because Charleston’s humidity means certain flooring materials need to acclimate on-site before installation even begins, a little planning upfront can be the difference between a project that goes exactly as scheduled and one that hits delays.

This guide walks through a clear, practical checklist of what to do before installation day, so you know exactly what to expect and when.

Why Acclimation Matters Here

The National Wood Flooring Association recommends acclimation time for all hardwood products, but in Charleston, it’s even more important. Wood responds to moisture not just topically, but environmentally. High humidity leads to expansion and low humidity to contraction. Before installation, a home should be kept in tightly controlled temperature and humidity windows so the flooring can adjust to its permanent conditions.

If flooring is not acclimated before installation, it will make the necessary adjustments and movements later on once it has been fastened, glued, or locked in place. Expansion may exceed the expansion gap left at the perimeter of the room, contribute to warping and buckling, and cause flooring failure. Contraction may leave you with gaps between boards.  

Acclimation is a non-negotiable—especially for solid and engineered hardwood floors. This is a technical necessity that needs to factor into your timeline.

2-3 Weeks before Installation

At this point, you should be taking care of the logistics of your installation and smoothing out the details. If this is a new construction home, make sure the HVAC system is running at optimal conditions and has been running for at least a week before materials are delivered.

It can be a good time to ensure that your material has arrived and begin making arrangements for delivery. Engineered hardwood requires a minimum of 48 hours of acclimation time, while solid wood needs much longer windows. Woodboys recommends a minimum of 5 to 7 days for proper acclimation of a solid.

This is also a great time to make necessary arrangements for pets and childcare on the day of install. While some installations may not require pets and small children to be out of the house, it may be convenient for you to take this variable out of the equation from the outset. Installation sites are noisy and dusty, and your pets might appreciate some peace and quiet elsewhere.

The Week Before

Make things as easy as possible for the installation crew. While many crews will remove the heavy or large furniture items as needed (or for an additional charge), expecting them to carefully remove small, fragile, or expensive items usually exceeds their scope of work. Remove wall art and breakables, as many of the smaller items as possible, and provide them plenty of room to work around knee-height (meaning some items may be able to stay in the tops of closets).

If you live in a neighborhood, you may need to arrange for gate passes, parking, and access to the jobsite on the day of. You may also want to flag any particular access constraints that might pose an issue: narrow staircases, on-street parking only, or historic-district considerations with time windows for construction work.

This allows your crew to plan accordingly, minimize wasted time, and ensure that everyone is happy.

Day-Of Preparation

At Woodboys, our crews frequently like to get started as early as possible. When they arrive, ensure that there is a clear path for their material and equipment so they can jump in right away. Our teams will notify you of their arrival time, so please make sure pets are secured off-site or in a closed-off area that will not be affected by your installation.

We understand that you might not able to be present at all times during the installation. If you must leave, ensure that someone is readily available for questions and has all of the information needed to make any necessary decisions quickly.

Keep in mind that a construction site is going to have noise and dust. Be clear from the outset what the timeline is for the completed project, when you will be able to walk on it, and when you will be able to place furniture back on it.

What to Expect During Multi-Day Installations

Multi-day installations for hard surface flooring is common. Living around the work can be frustrating, but preparation makes it a little easier. If you will remain in the home during the work, plan to occupy rooms unaffected by the current project (or move rooms as the installation progresses). Depending on the type of installation and flooring finish, you may want to make some areas off-limits to traffic until it cures.

Humidity can slow down the drying process on site sand-and-finish floors. Especially in Charleston, this is something to keep in mind if your installer tells you that you need to wait additional time before walking on it, even in socks.

A Note for New Construction vs. Older Homes

Not all jobsite conditions are exactly the same, so keep in mind these differences between new homes and older or historic homes.

New Construction in Summerville, Nexton, Cane Bay, and Beyond

 If you have a new construction home, there is likely lots of work to be done before or just after move-in. This means that your flooring contractor may need to coordinate with other trades. Typically, flooring is the last improvement made to your home so that other trades do not need to worry about protecting it during their work. Pinning down installation and remodeling dates from other contractors can help set a realistic window for flooring work to take place.

You will also need to confirm that your slab is fully cured and those requirements are met before a hard surface floor is installed. Moisture vapor emission rates and off-gassing can trap moisture beneath a new floor, leading to warping, buckling, and discoloration months later.

Older, Historic Homes in Downtown Charleston, Mount Pleasant, and Sullivan’s Island

These homes are established, so there is no need to worry about cure times. However, ensuring that the crawl space is in good condition with a moisture vapor barrier (or an encapsulation and dehumidification system running, if applicable) is a necessary first step. Crawl space conditions and necessary subfloor prep can slow down even the most skilled team, so plan for these situations as early as possible.

Don’t forget about access limitations on older homes as well. Parking may be more limited, which should be arranged before installers show up on the day of install.

After Installation: First 30 Days

After your new floors are installed, take time to enjoy them!

But don’t forget that new floors require some maintenance, too. Always keep your HVAC system running with temperatures set in the range of 60 to 80 degrees all the time. Extreme temperature and humidity fluctuations can cause movement in the floor, so climate control will protect your investment.

Maintain your new floors with the manufacturer’s recommended cleaner. Woodboys recommends Bona products for the majority of the floors we carry. Bona makes both a hardwood floor cleaner and a general hard surface cleaner for laminate and luxury vinyl plank or tile. Never use waxes, polishes, or refreshers on your new floor unless specifically instructed to do so.

FAQs

How long does material need to acclimate before installation in Charleston?

Acclimation time varies depending on the flooring type. Solid wood requires a longer acclimation period. Woodboys recommends five to seven days (or longer if possible) for solid hardwoods—longer for wider boards. Engineered wood requires a minimum of 48 hours. All wood products and subfloors should have moisture readings taken on the day of installation to make sure they are within range and suitable for the install.

Can I stay in my home during installation?

Sometimes, you can stay in your home during installation. If you don’t mind the dust or noise, are installing a prefinished product, and have places in your home you can occupy while work is being completed, then you may be able to stay—though it might not be comfortable. Site sand-and-finish floors usually require you to relocate for the duration of your job as finishes dry.

What should I do if my home is older and has limited access?

If your home is older and has limited access, discuss the issue with the flooring expert who comes out to provide a free consultation. They can work with you and the installation crew to find a solution before the day of installation.

Let Woodboys Handle the Process, From Start to Finish

Worried about juggling the logistics of your hardwood flooring installation? Woodboys has more than 40 years of experience handling flooring installations from start to finish. We handle the measuring, ordering, delivery, acclimation, and installation so that you don’t have to guess when things should be done.

If you want a skilled team to manage your upcoming flooring project, reach out to Woodboys now to book your free in-home installation!